Spring Hill is taking neighborhood sidewalk and trail requests until 4 p.m. Dec. 9. The city may pay up to 75% if 65% of neighbors sign on.
Spring Hill neighborhoods have until 4 p.m. Wednesday, Dec. 9, to ask the city for a new sidewalk or walking trail. The requests are for the city’s Neighborhood Sidewalk Program, which pays for small projects inside neighborhoods.
The city opened its call for projects on Nov. 9. Projects picked from this round would be built in the 2026-27 budget year, the city said.
Overview
- What: requests for sidewalks and multi-use trails inside Spring Hill neighborhoods
- Who can ask: a homeowners association, a neighborhood group or an individual
- Deadline: 4 p.m. Wednesday, Dec. 9
- Form: the city’s project request form
- Where to turn it in: City Hall, 199 Town Center Parkway, to the attention of CIP Director Missy Stahl
- Cost: the city recommends splitting it, with the city paying up to 75% and the neighborhood 25%
What you need to apply
The request form asks for:
- the neighborhood name and the project location
- a primary contact, with address, phone and email
- a description of the project, its rough length and why it is needed
The form also asks for an estimated cost, the share of city money requested and whether the route is on city right of way. Those answers are optional if you do not know them yet.
Neighbors must show support. The city’s program rules require a petition signed by the owners of at least 65% of the properties along the proposed route. The city provides a petition form.
The petition rules are strict:
- only the legal owner can sign; a renter cannot sign for the owner
- joint owners each sign, but each lot counts once
- owners of empty lots sign too
- an owner who was asked but did not answer, if that is documented, is left out of the count
Public Works checks every signature against county tax records. Spring Hill straddles two counties, so ownership is checked with the Maury County or Williamson County register of deeds.
How projects are ranked
City staff score each request on a scoring worksheet. The program rules say a project ranks higher for:
- safety: crash history, hills, curves, poor lighting, speeds or a missing gap in an existing sidewalk
- destinations: a school, park, transit stop or civic building nearby
- land use: links between homes, shops and offices, and denser zoning
- ease of building: good curbs and flat, clear shoulders
- location: a road listed as an arterial or collector in the city’s Major Thoroughfare Plan
- cost share: a bigger neighborhood contribution
Public Works then visits the site, prepares a rough cost and recommends a ranked list to the city administrator. A chosen project gets a final design, shown to the neighborhood at an information meeting. Once the neighborhood can pay its share, the Board of Mayor and Aldermen decides whether to approve and fund it.
What it means for you
If your street lacks a sidewalk, or a gap stops children walking to school or a park, this is the route to ask for one. Start the petition early. Getting 65% of owners to sign before Dec. 9 is the hardest part.
Budget for your share. The 25% neighborhood share covers part of every cost, including grading the shoulder, rebuilding driveways, signs and landscaping, the program rules say. Moving a mailbox, if the design requires it, is up to the homeowner. Neighbors may also need to help the city get easements where the route crosses private land.
Sidewalks must be at least 5 feet wide under city subdivision rules, the city said. Multiply the length by 5 feet to estimate the square footage. Trails are 5 feet for walking, 6 feet recommended, or 8 feet for two-way bike use.
Funding depends on the city budget, and the board has the final say. The city also runs a Neighborhood Traffic Calming Program for speeding on residential streets.
Questions go to Stahl at mstahl@springhilltn.org or City Hall at 931-486-2252.
Have your say